Kempegowda International Airport Bengaluru
Bengaluru · India · Asia/Calcutta
Rate & Review BLR
Share your experience — security wait times, lounge quality, transit tips and more.
Traveler Guides
Current Conditions
Loading live weather…
Route Intelligence
Airport Connectivity Score
Regional Hub
Calculated from destination count, airline diversity, and haul-mix coverage. More signals (customs/border access, ground handling capacity) will be added as the dataset grows.
Runways
Haul Mix
Geographic Context
10 Nearest Airports
ATC Frequencies5
Top Aircraft Types
Live Departures & Arrivals6
Source: adsb.lol — community ADS-B network. Approximate local traffic within 40nm, not a definitive schedule.
Aircraft Spotted Here
Photos © their respective photographers, via JetPhotos.com — click a photo to view the original.
Airline Records in Dataset28
Data Notes & Community Corrections
Community corrections will appear here once verified travellers start contributing.
Community page — traveler reviews →Dining & Drinks
External Links
Airport HistoryEst. 2008
Bengaluru's airport was built from scratch at Devanahalli as a greenfield public-private partnership after years of delay, opening in May 2008 to replace the congested HAL Airport. Renamed for the city's 16th-century founder in 2013, it has since added a second runway and a landmark new terminal, growing into India's third-busiest airport.
In March 1991 the National Airports Authority of India selects Devanahalli, about 30 km north of Bengaluru, as the site for a new airport to replace the congested HAL Airport.
After a public-private partnership structure is agreed in May 1999, Bengaluru International Airport Limited (BIAL) is incorporated in January 2001 to build and operate the airport.
Construction, begun 2 July 2005, completes in 32 months; the airport officially opens on 24 May 2008 as India's third greenfield PPP airport, with the first commercial flight (Air India from Mumbai) landing the night before.
A ₹1,500 crore expansion completed in December 2013 roughly doubles the terminal to 150,556 m² (raising capacity to 25 million passengers); on 14 December 2013 the airport is officially renamed Kempegowda International Airport after the city's founder.
A second runway (09R/27L), capable of handling Code-F aircraft such as the Airbus A380, is commissioned on 6 December 2019.
Prime Minister Narendra Modi inaugurates Terminal 2 on 11 November 2022; the ₹5,000 crore first phase, styled as a tribute to Bengaluru's 'Garden City' identity, begins domestic operations in January 2023 and international operations in September 2023.
The airport records a string of firsts: Ethiopian Airlines' first nonstop Bengaluru–Africa link (2019), Air India's first nonstop Bengaluru–North America route to San Francisco (2021), and in 2022 Qantas' first nonstop Bengaluru–Oceania service to Sydney alongside Emirates' first A380 flights to the airport.
General encyclopedic and industry sources (Wikipedia, Simple Flying, Airport Technology), cross-checked. TIME-SENSITIVE FLAG: ownership percentages and FY2025-26 traffic figures (44.47 million passengers) reflect the most recent data found and are likely to change; forward-looking plans for Terminal 2 Phase 2 and a future Terminal 3 (targeting 90-100 million passenger capacity) are proposals, not completed facts, as of this research.


